By FS25 Index · Updated
If a harvest takes longer than expected, check where the time goes before buying a more powerful machine. A larger engine does not tell you the working width, the field speed or how often the harvester has to wait.
The work-time calculator starts with a geometric planning rate: width in metres multiplied by speed in kilometres per hour, divided by ten, gives theoretical hectares per hour. Its efficiency input reduces that rate for the losses you choose to allow for. This is an estimate, not FS25's contract-duration formula.
Find the bottleneck
Watch part of the job and note the pattern: cutting, turning, unloading, travelling or waiting for transport. If unloading dominates, changing cutting width alone may not address the delay. If turns and overlap dominate, revise efficiency instead of pretending every pass uses the full stated width.
Enter the area you intend to harvest and a speed appropriate to your configuration. Add extra time for unloading and travel. Avoid allowing for the same interruption in both reduced efficiency and extra hours unless they describe different losses.
Use a recorded machine relationship
For green beans, the catalogue links the crop to the OXBO BP2140e. Check its documented width and working speed before sending them to the calculator. The field, configuration and operating conditions still need your judgement.
Compare the original estimate with a transport-focused alternative before replacing equipment. Keep the area and crop the same so you can see which change explains the difference. After harvesting, retain observed timings for a similar job, not as a guaranteed rate for every field.
Source attribution