By FS25 Index · Updated
Hiring a helper can free you to do another job, but the wage estimate still needs two inputs: a rate and the number of paid hours you are budgeting. Neither comes automatically from the field's area.
Use a rate you can check in your save, with the same currency and time unit as the calculator. If you only have a rough allowance, record it as an assumption. The helper-cost tool multiplies the hourly rate by the hours entered; it does not reproduce the game's billing rules.
Keep two time estimates
One figure is the duration for which you intend to budget wages. The other is the elapsed time needed to complete the job, including moving machines, unloading and interruptions. They may differ, but do not assume that waiting or unloading is free. As a cautious budget, allow for the full hired-job interval. GIANTS’ published 1.20 code updates costs for active jobs rather than checking productive passes in that billing loop. The installed 1.24 billing behavior was not verified; use observed wage deductions and check whether the job remains active.
For more than one helper, budget for each rather than applying one person's hours to the whole group. Keep fuel and consumables separate unless they are already included in another cost entry. This avoids omissions and double counting.
Compare the jobs the helper makes possible
Ask what you will do while the helper works. If you also need to unload the machine or bring supplies, leave time for that support instead of scheduling yourself elsewhere for the whole period.
For a contract, carry the wage allowance into manual analysis, alongside rental and operating costs. For your own field, compare it with the cash reserved for the next stage.
After the job, note the observed cost and interruptions. That improves the next estimate without turning one result into a universal wage or work rate.
Source attribution
Companion: calculation methodology: https://fs25-ultimate-companion.erevio.chatgpt.site/data (checked 2026-09-09; Companion methodology 1.0)