Field work time
Make the assumptions explicit. Change the inputs and see the result.
Grass: configured base yield 43700 L/ha. Field conditions and modifiers change actual yield.
Editable planning assumptions, not exact in-game values. Example values are prefilled. Use one currency throughout.
CALCULATED ESTIMATE
3.3 hours
Estimated total time3.38 ha/h
Effective work capacityCapacity = width × speed ÷ 10 × efficiency. Duration = area ÷ capacity + extra minutes ÷ 60.
Use this duration in the contract planner ↗