Field work time
Make the assumptions explicit. Change the inputs and see the result.
Editable planning assumptions, not exact in-game values. Machine width and speed are prefilled where verified. Use one currency throughout.
Using SAMSONAGRO SBH4 36
CALCULATED ESTIMATE
0.56 hours
Estimated total time43.2 ha/h
Effective work capacityCapacity = width × speed ÷ 10 × efficiency. Duration = area ÷ capacity + extra minutes ÷ 60.
Use this duration in the contract planner ↗