Field work time
Make the assumptions explicit. Change the inputs and see the result.
Editable planning assumptions, not exact in-game values. Machine width and speed are prefilled where verified. Use one currency throughout.
Using GREATPLAINS SOLID STAND 1500
CALCULATED ESTIMATE
2.75 hours
Estimated total time4.14 ha/h
Effective work capacityCapacity = width × speed ÷ 10 × efficiency. Duration = area ÷ capacity + extra minutes ÷ 60.
Use this duration in the contract planner ↗